Phase 1 (complete) - Extending Sacramento St to Broadway Blvd
The first part of this highly anticipated project includes creating another entrance to the Bayridge Subdivision. Contractors are currently preparing the area between Sacramento St and Broadway Blvd. Crews will build a box-culvert bridge to create the Sacramento St extension. The bridge will include paved roadway, sidewalks, curb & gutter, railing, ADA ramps, pavement striping/markings & signage, and ditch & drainage improvements.
Phase 2 (in progress) - Widen Broadway Blvd & Add a Turning Lane
The final phase of the project includes widening Broadway Blvd to 2 lanes each direction from US 181 and approximately Meadowbrook Dr. Additionally, a right-turn lane will be added so motorists can easily access the US 181 Frontage Road heading towards Gregory.
Phase 3 - (in progress) Install Traffic Lights at California Dr & Broadway Blvd Intersection
The City of Portland recognizes the growing traffic in the area. To increase the safety for all, a 4-way traffic light will be installed at the intersection of California Dr and Broadway Blvd.